Viewing as Property Manager
Water intrusion under kitchen sink
Harbor Point Apartments · Bldg B · 214 Tommy Reyes Due Jul 31, 11:36 AM
Details
Resident reports steady drip and swollen cabinet base. Water shut off at supply valve.
- Category
- Plumbing
- Reported by
- Devon Pratt (resident)
- Created
- Jul 31, 6:48 AM
- Permission to enter
- Granted
- Preferred availability
- Any time — resident home today
- Resident contact
- (901) 555-0187
- Scheduled
- Not scheduled
- Labor logged
- 75 min
Check adjacent unit 114 ceiling for staining.
Active water leak with cabinet damage. Emergency priority suggested due to ongoing water damage risk and possible impact to the unit below.
- Confirm supply valve holds
- Moisture-meter adjacent wall
- Inspect unit below for ceiling staining
Suggestions are advisory only. A person must review and apply them — nothing is changed automatically.
Media & completion evidence
Before and after documentation attached to this work order.
- Cabinet damage (before)before
File uploads are represented as placeholders in this demo. Storage-backed uploads are part of the next build phase.
Activity & audit history
Every status change, assignment, cost, and comment is recorded.
- Devon Pratt· resident· Jul 31, 6:48 AMResident visible
Resident submitted request with 2 photos.
- Ray Delgado· maintenance supervisor· Jul 31, 7:16 AMAI
AI suggested category Plumbing and priority Emergency. Awaiting human confirmation.
- Ray Delgado· maintenance supervisor· Jul 31, 7:45 AM
Priority set to Emergency and status moved to Triage.
- Ray Delgado· maintenance supervisor· Jul 31, 9:12 AM
Assigned to Tommy Reyes.
- Tommy Reyes· technician· Jul 31, 11:36 AMResident visible
On site — status In Progress.
Costs
- Emergency response laborlabor · 1.25 × $65.00$81.25
- Supply line + shutoff valvematerial · 1 × $24.00$24.00
Handling
This work order is currently handled by in-house staff.